How to specify production factors to change production times of operations

You can specify production factors from the following:

“Production factor” in the item table
“Production factor” in the resource table
“Production factor” in the master use instruction
“Production factor” in the order table
“Production factor” in the scheduling parameter settings
“Production factor” in the project settings

A production factor of a given operation is calculated as the product of all the production factors.