Asprova E-Learning: Hands-on Training - Lesson 9 (2h)

Lesson 9 continues on from lesson 8 where our goal is still to improve the scheduling precision so that we can meet increasing customer orders. For this lesson, we will explain the logics of how to determine operation assignment direction and calculate quantities.






Please click below to start watching Lesson 9 in the Asprova E-Learning Course for Hands-on Training.
< Asprova E-Learning: Lesson 9 (2h) > (Video Play Time: 11min 24sec)


Quantity Fixed Level

All operations have a quantity fixed level that determines the overall quantity of operations of an order. Quantities of operations before and after an operation are calculated based on the operation with the highest quantity fixed level.

Time Fixed Level

Each operation has a time fixed level. This time fixed level determines the direction in which the operation is assigned. The assignment direction is determined so that operations with small time fixed levels will be assigned in a way that they are pulled towards operations with larger time fixed levels.