Asprova E-Learning: Hands-on Training - Lesson 6 (2e)

Lesson 6 shows that the scheduling parameter is a command for making a schedule and by using your own customized scheduling parameters you will be able to specify the parameters you require to make the schedule most suited to your manufacturing shop-floor. This section explains how to build up your own scheduling parameters.





Please click below to start watching Lesson 6 in the Asprova E-Learning Course for Hands-on Training.
< Asprova E-Learning: Lesson 6 (2e) > (Video Play Time: 29min 58sec)


Resource Evaluation

If there are multiple candidate resources for an operation, Asprova uses an evaluation expression as a criterion for selecting a resource. You can specify this expression by selecting a scheduling parameter and specifying a value for the "Evaluation expression" property.

Unfix All

If you fix the operations and reschedule the previous operations and next operations are pulled towards the fixed operations in such a way that this method could be used as a solution to bottleneck resources.