Case Study 22: Mitsui Engineering & Shipbuilding
The production plan made by Asprova covers 2 years. There are about 5000 orders, 6-7 target processes, and upwards of 30,000 operations. They make a plan once a week, each time taking nearly 5 minutes, without any frustration.
Case Study 13 : Mitsubishi Heavy Industries,Ltd
MHI installed Asprova to automate scheduling work and, with the addition of the Sales option, found it very effective in making production planning more uniform
Case Study 6 : Metal Manufacturer
Not only reduced scheduling time to 3 hours but cut scheduling cycle to once a week.
Case Study 4 : Auto Parts Manufacturer
Auto Parts Manufacturer Chooses Asprova For Scheduling Speed. Reduces Setup Time and Inventory in Two Months
Case Study 3 : Auto Parts Manufacturer
Achieved consistency between processes, enabling smaller lot sizes and reduction of excess inventory, which could now be managed visually.
Case Study 1 : Pipe Manufacturer
Pipe Manufacturer Chooses Asprova for Scheduling Speed. Achieves Load Leveling and Major Inventory Reduction ( more than 30% ).