Case Study 25:NewNamLee Electrical Co. Ltd.
Time spent on making the production plan reduced from 2 hours to 30 minutes; Plan execution reached 90%
Case Study 19: Hitachi Electronic Devices
Due to the high-speed of the scheduling, became able to quote due dates for rush orders immediately.
Case Study 16 : Ricoh Co., Ltd
Installing Asprova in order to deal with high-mix, low-volume manufacture realized a 50 percent cut in both production lead time and production planning time, and resulted in reduction of in-progress inventories.
Case Study 9 : Casio Micronics
Scheduling system for semiconductor manufacturing. Productivity enhancement judging by results of the operation improvements as well as the information processing improvements.
Case Study 2 : Electric Manufacturer
Electric Manufacturer Chooses Asprova for GUI and Rich Features. Shortens Planning Cycle and Improves Scheduling Process