Case Studies (Sort by process’s name)

Asprova has developed a solid reputation among many users in the manufacturing industry and is being implemented in a growing number of factories in various fields. In this section we will see Asprova’s role and what Asprova is contributing in actual production plants.

Panasonic Appliances Air-Conditioning Malaysia Sdn. Bhd.

Asprova is used as a standard global production scheduling system to help enable more efficient planning and reduce inventory.

Read More…

Kobayashi Create Co., Ltd.

Adaption to Build-to-Order, achieving Visualization of the whole plant and enhancing production throughput by over 30%


Read More…

Fuji Film Computer Systems

Chooses Asprova for its excellent user interface

Reduces labor of adjusting the schedule


Read More…

Dye Manufacturer

Chooses Asprova For High Speed Scheduling Process and User-friendly GUI Environment

Scheduling Done Even Without Schedule Manager


Read More…

Pentel Corporation

Decrease the inventory dramatically. Improve promise of order due date.

Read More…

Nippon Shikizai

Chose Asprova because of its large user base and excellent functionality.

Achieve visualization of the workflow and a reduction in the time taken to plan the schedule


Read More…

NewNamLee Electrical Co. Ltd.

Time spent on making the production plan reduced from 2 hours to 30 minutes; Plan execution reached 90%


Read More…

Mitsui Engineering & Ship Building Co Ltd

Through Asprova, not only successful short-term planning, but also mid, and long-term planning.

Utilizing IT tools to standardize human technology; Achieved overall optimization through short・medium・long term planning…


Read More…

Mitsubishi Heavy Industries

Chooses Asprova to achieve greater precision

Reduces scheduling time and lead times


Read More…

Metal Manufacturer

Chooses Asprova for its high speed scheduling

Reduces scheduling time and schedule cycle time


Read More…

Auto Parts Manufacturer

Achieved consistency between processes,

enabling smaller lot sizes and reduction of excess inventory, which could now be managed visually.


Read More…

Auto Parts Manufacturer

Auto Parts Manufacturer Chooses Asprova For Scheduling Speed.

Reduces Setup Time and Inventory in Two Months


Read More…

Pipe Manufacturer

Introduces Asprova for scheduling speed

Achieves load leveling and major inventory reduction


Read More…

Federal Corporation

With Asprova scheduling time was reduced from 1-5 days to 30-60 minutes

Proportion of products delivered directly without having been stored increased from 45% to 85%, leading to savings of 50 million NTD/year; Inventory turnover was reduced from 20 to 15 days contributing another 60 million NTD/year.


Read More…

Bridgestone Elastech

Choose Asprova to improve the efficiency and accuracy of production planning.

Re-installing Asprova to only a few processes, and reflecting the experience of installing Asprova in China.


Read More…

NewNamLee Electrical Co. Ltd.

Time spent on making the production plan reduced from 2 hours to 30 minutes; Plan execution reached 90%


Read More…