Case Studies (Sort by products’s name)
Asprova has developed a solid reputation among many users in the manufacturing industry and is being implemented in a growing number of factories in various fields. In this section we will see Asprova’s role and what Asprova is contributing in actual production plants.
Textile
Dye Manufacturer
Chooses Asprova For High Speed Scheduling Process and User-friendly GUI Environment Scheduling Done Even Without Schedule Manager Read More… |
Printing
Kobayashi Create Co., Ltd.
Adaption to Build-to-Order, achieving Visualization of the whole plant and enhancing production throughput by over 30% Read More… |
Gama Impresores
Chooses Asprova to improve customer satisfaction Reduces scheduling time and lead times Read More… |
Chemical
Nippon Shikizai
Chose Asprova because of its large user base and excellent functionality. Achieve visualization of the workflow and a reduction in the time taken to plan the schedule Read More… |
Fuji Film Computer Systems
Chooses Asprova for its excellent user interface Reduces labor of adjusting the schedule Read More… |
Japan Polyolefins
Chooses Asprova for Processing Speed Now, Only One Person is Responsible for Two Factories’ Scheduling Work Read More… |
Rubber, Gum
Federal Corporation
With Asprova scheduling time was reduced from 1-5 days to 30-60 minutes Proportion of products delivered directly without having been stored increased from 45% to 85%, leading to savings of 50 million NTD/year; Inventory turnover was reduced from 20 to 15 days contributing another 60 million NTD/year. Read More… |
Bridgestone Elastech
Choose Asprova to improve the efficiency and accuracy of production planning. Re-installing Asprova to only a few processes, and reflecting the experience of installing Asprova in China. Read More… |
Metal products
Pipe Manufacturer
Introduces Asprova for scheduling speed Achieves load leveling and major inventory reduction Read More… |
General-purpose machinery and equipment
SASAKURA
Indonesia plant introduced Asprova to build a platform of in-house communication from a coaching standpoint. Asprova was installed to instill in local staff an awareness of backward scheduling. Read More… |
Metal Manufacturer
Chooses Asprova for its high speed scheduling Reduces scheduling time and schedule cycle time Read More… |
Electronic parts and devices and electronic circuit
NewNamLee Electrical Co. Ltd.
Time spent on making the production plan reduced from 2 hours to 30 minutes; Plan execution reached 90% Read More… |
Hitachi Electronic Devices
Chose Asprova to response faster to frequent changes of orders and visualize the production line. Dramatically faster processing speed of production scheduling; able to deal with rush orders; visual display of progress by Gantt charts. Read More… |
Ricoh
Chose Asprova in order to deal with high-mix, low-volume manufacture realized a 50 percent cut in both production lead time and production planning time, and resulted in reduction of in-progress inventories. The increasing number of managed machines made the team to recognize the necessity of production scheduler. Read More… |
Casio Micronics
Introduces Asprova for scheduling speed Achieves load leveling and major inventory reduction Read More… |
Electric Manufacturer
Introduces Asprova for GUI and rich features Shortens planning cycle and improves scheduling process Read More… |
Electrical machinery and apparatus
Panasonic Appliances Air-Conditioning Malaysia Sdn. Bhd.
Asprova is used as a standard global production scheduling system to help enable more efficient planning and reduce inventory. Read More… |
Mitsui Engineering & Ship Building Co Ltd
Through Asprova, not only successful short-term planning, but also mid, and long-term planning. Utilizing IT tools to standardize human technology; Achieved overall optimization through short・medium・long term planning… Read More… |
Panasonic Home Appliances
Production lead time reduced from 2 weeks to 1 week, planning time reduced from 8 man days to 2 man days. Making process plans efficiently with Asprova; Amazed by the power of expression… |
Mitsubishi Electric Nagoya
Chooses Asprova for its high speed scheduling Reduces scheduling time and schedule cycle time Read More… |
Information and communication electronics equipment
Tohoku TKR Corporation
Implementing Asprova to visualize work in progress from initiation to completion. Optimize management system and speed up decision-making; Visualization of information in order to promote consensus view for all employees… Read More… |
Transportation equipment
Auto Parts Manufacturer 2
Chose Asprova for more efficient product planning times. Effectively reduces plan proposal time and cuts back on inventory to trim lines of completed product inventory 62.8%. Read More… |
Mitsubishi Heavy Industries
Chooses Asprova to achieve greater precision Reduces scheduling time and lead times Read More… |
Auto Parts Manufacturer
Chooses Asprova for its excellent user interface Reduces labor of adjusting the schedule Read More… |
F-Tech
Chooses Asprova for scheduling speed Reduces setup time and inventory in two months Read More… |
Shonan Unitec
Reduces inventory and achieves consistency among process plans “Asprova” a byword for production planning throughout the factory Read More… |
Other products
Pentel Corporation
Decrease the inventory dramatically. Improve promise of order due date. Read More… |
Yamaha Corporation
Scheduling time, production lead times and WIP inventory have all been reduced by about 30% Points:Designing operational procedures and visualizations according to shop floor needs, making sure that the transition is smooth. Read More… |
Yamaha Corporation interview
Yamaha Corporation Digital Instrument Division implement Asprova in October, 2009. Here is the interview of Mr. Miyada, who in charge of this project.
Please click the movie when you want to replay