Group Assign
Grouping operations, assigning them either simultaneously or consecutively
1. The production start time is the same for the same resource.
2. The production start time is the same for different resources.
3. Operations are linked consecutively according to the specified order.
4. Simultaneous start and consecutive start can also be combined.(Requires plug-in)
2. The production start time is the same for different resources.
3. Operations are linked consecutively according to the specified order.
4. Simultaneous start and consecutive start can also be combined.(Requires plug-in)
For further details refer to the help page.
Group Assign