Optimization
Work sequences can be optimized for all resources As long as orders are not delayed can perform the following: 1. Grouping of lots of same products within a certain period 2. Order the work sequence to minimize the set-up time 3. Sorting from light to dark colours or from thick to thin metal sheets 4. Takes into account multiple properties [Work sequence sorted from light to dark colours] For further details refer […]
Event
Set event conditions for each resource and generate event 1. Automatic planning of one-day maintenance after a specified amount of use 2. Automatic planning of half-hour equipment cleaning after a specific length of time in use 3. Automatic insertion of set-up times before/after/during specific orders [Generated Event] For further details refer to the help page.
Time Constraint Max
Maximum time between processes can be preset Example: Perishable WIP such as food and beverages, chemicals and medicines etc. 1. The time between the end of the previous process and the start of the next process can be restricted 2. Time between the start of the previous process and the start of the next process can be restricted For further details refer to the help page.
Resource Lock
After completing the production a resource can be locked for a certain amount of time Example: Tank facilities etc. 1. Locking the resource until the succeeding process begins 2. Locking the resource until the succeeding process ends 3. Locking he resource for a certain time period after the start of the succeeding process For further details refer to the help page.
Group Assign
Grouping operations, assigning them either simultaneously or consecutively 1. The production start time is the same for the same resource. 2. The production start time is the same for different resources. 3. Operations are linked consecutively according to the specified order. 4. Simultaneous start and consecutive start can also be combined.(Requires plug-in) For further details refer to the help page.
KPI
KPI (Key Performance Indicators) evaluated for a whole project or specific orders, resources or products, and then saved in history. Main KPI (from a total of 51 kinds): 1. Turnover 6. Profit 11. Total / finished and intermediate goods in piece numbers 2. Material costs 7. Rate of profit 12. Total/ WIP and finished goods in cash value 3. External labor costs 8. ROI Return on Investment 13. Purchased Item Inventory 4. […]
Purchase
Linking and synchronization of the production plan and purchase information Application:Automatic compilation of purchase plan from the production plan. Creation of middle or long term purchase plans. Use already existing materials purchase plan as constraint when making the production plan 1. Compile a purchase plan 2. Specify purchase lot-size 3. Link between the current stock levels and sales orders [Purchase Plan Table] For further details refer to the help page.
Sales
Linking sales information and production planning Application:Automatic compilation of production orders from sales information, backward planning and assignment for required date. 1. The production plan and sales orders can be linked in order to predict delivery time. 2. Compilation of a sales plan from yearly or monthly production plans 3. Links directly with raw material and purchase orders [Daily Sales Plan Table] For further details refer to the help page. Purchase>>