Ver.14.1.0 The pegs between operations and orders on the Gantt chart can be freely edited

Previously, it was necessary to register output items and input items in the Integrated Master for pegging. Further, in the next order, pegging could not be done midway in a process. With this addition of these features, you can now easily peg operations on a Gantt chart and set time constraints without having to register output items and input items. You can also perform pegging between operations of midway processes.   Asprova […]

Ver.14.1.0 You can easily copy the Integrated Master of Job Order Production and Engineer To Order

In the case of Engineer To Order (ETO), it is necessary to create an Integrated Master for each order. Until now, in Asprova, it took time and effort to create an Integrated Master for each order. To remedy this, we added a feature that makes it possible to automatically create order-specific items and Integrated Master for a particular order by simply registering items to be used as a template and selecting and […]

Asprova Ver.14.0

■Added simplified holiday registration and national holiday download function. When “HOLS” is specified as “date or day of the week” in the calendar table, holiday shifts can be applied to the dates registered in the holiday table. Moreover, you can download holidays to the holiday table by specifying the country. 186 countries are supported. This makes it possible to automatically make national holidays into holiday shifts.       Asprova HELP -> […]

Ver.14.0.0 Added simplified holiday registration and national holiday download function

When "HOLS" is specified as "date or day of the week" in the calendar table, holiday shifts can be applied to the dates registered in the holiday table. Moreover, you can download holidays to the holiday table by specifying the country. 186 countries are supported. This makes it possible to automatically make national holidays into holiday shifts.       Asprova HELP -> http://lib.asprova.com/onlinehelp/en/AS2003HELP00706600.html -> [GUI]-[Holiday Table]-[Holiday Table] – HelpNo.:706600

Ver.14.0.0 Support of Active Directory

Microsoft Active Directory is now available for user authentication when logging into Asprova DS or Asprova NLS. This allows aggregation of user and password management in Active Directory.   Moreover, the Single Sign On function for logging in using the currently logged in Windows user is also supported, and in that case, you do not have to enter your user name and password when logging in.   Asprova HELP -> http://lib.asprova.com/onlinehelp/en/AS2003HELP00737855.html -> […]

Asprova Ver.13.1

■Working patterns can now be modified on the Gantt chart in Excel-like fashion. You can edit calendars on the Gantt chart through copy and paste as well as direct input in Excel-like fashion. Shifts and resource quantity settings can also be entered on the Gantt chart or copied and pasted. This allows intuitive maintenance on the Gantt chart. Asprova HELP -> http://lib.asprova.com/onlinehelp/en/AS2003HELP00670300.html -> [GUI]-[Table Time Chart Windows]-[Resource Gantt chart]-[Working pattern display] – […]

Ver.13.1.0 Working patterns can now be modified on the Gantt chart in Excel-like fashion.

You can edit calendars on the Gantt chart through copy and paste as well as direct input in Excel-like fashion. Shifts and resource quantity settings can also be entered on the Gantt chart or copied and pasted. This allows intuitive maintenance on the Gantt chart. Asprova HELP -> http://lib.asprova.com/onlinehelp/en/AS2003HELP00670300.html -> [GUI]-[Table Time Chart Windows]-[Resource Gantt chart]-[Working pattern display] – HelpNo.:670300

Ver.13.1.0 Overwrite calendar

An overwrite calendar table allowing editing of working time without providing shifts has been added. Additions, modifications and deletions can also be made on the Gantt chart. The added overwrite calendar can be moved and its time can be freely changed with the mouse. Adjustments that are difficult to register for shifts whose time is undecided, such as shown below, are now easy to do.   Non-working time) Sudden equipment failure, power […]

Ver.13.1.0 Added new type “Continuous” to Group assign option

A new assignment type, "continuous", has been added to the group assign option. This allows arbitrary grouped operations to be assigned consecutively on the same resources. The starting order of the grouped operations and the upper limit of the time interval between operations can also be specified. This makes it easier to plan campaign production as seen in the pharmaceutical and other industries. Asprova HELP -> http://lib.asprova.com/onlinehelp/en/AS2003HELP00777650.html [Option Features]-[Group assign option] – […]