Asprova Ver.12.0.3

■Improved message window Error locations are now easier to find

When the scheduling parameters are executed, messages are output in the same hierarchical structure as the scheduling parameters.
Moreover, if errors, such as improper assignment within the schedule period, occur when the scheduling parameters are executed, the number of errors and the number of warnings are added in text form to the messages issued while the scheduling parameters are executed, and if the number of errors is 1 or more, “Level” changes to “Error” and the icon changes.
Example when error occurs

Message Window

Example when no error occurs

Message Window

The “Assignment Count” is the number of times an operation has been assigned. When an operation is assigned once, then unassigned, and then assigned again, it is counted as 2.
The log output function for investigating the cause of assignment failure has also been enhanced.
If, when performing assignment to a given resource candidate, assignment could not be done within the assignment period, the count of causes of failure during tentative assignment is displayed.
Moreover, if the assignment direction is forward, the EST serving as the starting point for searching for the assigned position is output, and if the assignment direction is backward, the LET serving as the starting point for searching for the assigned position is output.
This makes it easy to find out why an assignment failed and which setting needs to be checked.

Message Window

Asprova HELP
-> http://lib.asprova.com/onlinehelp/en/AS2003HELP00663000.html
-> [GUI]-[Global Windows]-[Properties Window]-[Properties Window] – HelpNo.:663000

■Support of phantom items

Phantom items are now supported.
Phantom items are not scheduled themselves. Instead, scheduling is done by replacing the phantom item with its component items.
In the following example, item PhantomPartsA is the phantom item, and PartsA1, PartsA2, and PartsA3 are the parts that make up the phantom item.

Phantom items
Phantom items

Parts such as set parts can easily be set and changed in the Integrated Master.
Moreover, synchronization with ERPs that support Phantom items is easy to achieve.
Asprova HELP
-> http://lib.asprova.com/onlinehelp/en/AS2003HELP00750080.html
-> [Logic]-[Master]-[Phantom item] – HelpNo.:750080

■Support of phantom items

Phantom items are now supported.
Phantom items are not scheduled themselves. Instead, scheduling is done by replacing the phantom item with its component items.
In the following example, item PhantomPartsA is the phantom item, and PartsA1, PartsA2, and PartsA3 are the parts that make up the phantom item.

Phantom items
Phantom items

Parts such as set parts can easily be set and changed in the Integrated Master.
Moreover, synchronization with ERPs that support Phantom items is easy to achieve.
Asprova HELP
-> http://lib.asprova.com/onlinehelp/en/AS2003HELP00750080.html
-> [Logic]-[Master]-[Phantom item] – HelpNo.:750080