Ver.14.1.0 We added a feature to change the time between processes by condition by describing the time constraints with expressions

We created expressions for time constraint MIN(MAX) and resource L(R) time buffer. It is possible to create condition expressions by using information on operations in a preceding process or subsequent process, assigned resources of operations of preceding or subsequent processes, assignment direction, and the like. This makes it possible to take into consideration the distance between manufacturing facilities and add leeway time to each order. For example, assume that the distances between resources A and B in the previous process and resources X and Y in the subsequent process are different. The time constraint can be easily changed through the combination of assigned resources if it is a time constraint MIN expression.

Asprova Help

-> http://lib.asprova.com/onlinehelp/en/AS2003HELP00754020.html

-> [Logic]-[Time Constraint Method/Time Constraint]-[Time Constraint MIN Expression, Time Constraint MAX Expression, Resource L time buffer expression, Resource R time buffer expression] – Help No.: 754020